{"id":33235,"date":"2019-05-20T13:20:09","date_gmt":"2019-05-20T05:20:09","guid":{"rendered":"http:\/\/47.96.102.57\/vestled-by-schonherr.html"},"modified":"2019-06-14T17:26:35","modified_gmt":"2019-06-14T09:26:35","slug":"vestled-by-schonherr","status":"publish","type":"post","link":"https:\/\/mooool.com\/en\/vestled-by-schonherr.html","title":{"rendered":"Vestled by Sch\u00f8nherr"},"content":{"rendered":"
\u672c\u6587\u7531 Sch\u00f8nherr \u6388\u6743mooool\u53d1\u8868\uff0c\u6b22\u8fce\u8f6c\u53d1\uff0c\u7981\u6b62\u4ee5mooool\u7f16\u8f91\u7248\u672c\u8f6c\u8f7d\u3002<\/span><\/span><\/strong> <\/p>\n Sch\u00f8nherr<\/a><\/strong>\uff1a\u672c\u6848\u9009\u5740\u5efa\u8bbe\u5728Hvide Sande\u6751\u5e84\uff0c\u9879\u76ee\u4e0e\u6d77\u76f8\u8fde\uff0c\u4e3a\u6240\u6709\u4eba\u521b\u9020\u4e86\u4e00\u6761\u901a\u5f80\u6d77\u8fb9\u7684\u901a\u9053\u3002\u4ece\u505c\u8f66\u573a\u7a7f\u8fc7\u6c99\u4e18\u901a\u5411\u6d77\u5cb8\u7684\u5761\u9053\u7531\u9970\u9762\u77f3\u6750\u88c5\u9970\u800c\u6210\uff0c\u73b0\u6d47\u6df7\u51dd\u571f\u8fb9\u754c\u5c06\u5176\u73af\u7ed5\u8d77\u6765\uff0c\u5148\u8fdb\u7684\u57fa\u7840\u7cfb\u7edf\u8d77\u5230\u4e86\u56fa\u5b9a\u4f5c\u7528\u3002\u6c99\u4e18\u811a\u4e0b28\u7c73\u957f\u300146\u5398\u7c73\u9ad8\u7684\u6df1\u9752\u94dc\u96d5\u5851\u8c61\u5f81\u7740\u5730\u5e73\u7ebf\u7684\u4e00\u90e8\u5206\uff0c\u4e3a\u6e38\u4eba\u63d0\u4f9b\u4e86\u4e00\u4e2a\u6574\u4f53\u800c\u8212\u9002\u7684\u4f11\u61a9\u5ea7\u6905\u3002<\/p>\n Sch\u00f8nherr<\/a><\/strong>: The project Vestled at Hvide Sande Village create accessibility to the seaside for everybody in any physical condition. The project is partly a ramp made of facing stone \u2013 which provides access from the existing parking lot, via the dunes toward the shore. The coating is encircled by an in-situ cast concrete border and kept in position by an advanced foundation system. The second part of the work lay by the foot of the dunes. It\u2019s a part of the horizon figuratively withdrawn \u2013 a 28 meter long and 46 cm high dark patina bronze sculpture. This part of the project provides fully integrated and comfortable seating opportunities.<\/p>\n <\/p>\n \u25bc\u573a\u5730\u9e1f\u77b0 \u00a0<\/strong>Aerial<\/span><\/p>\n <\/p>\n \u25bc\u73b0\u6d47\u6df7\u51dd\u571f\u8fb9\u754c\u5c06\u77f3\u6750\u9970\u9762\u7684\u6c99\u4e18\u73af\u7ed5\u8d77\u6765 \u00a0<\/span><\/strong>The coating is encircled by an in-situ cast concrete border.<\/span><\/p>\n <\/p>\n \u25bc\u6c99\u4e18\u811a\u4e0b28\u7c73\u957f\u300146\u5398\u7c73\u9ad8\u7684\u6df1\u9752\u94dc\u96d5\u5851\u8c61\u5f81\u7740\u5730\u5e73\u7ebf\u7684\u4e00\u90e8\u5206\uff0c\u4e3a\u6e38\u4eba\u63d0\u4f9b\u4e86\u4e00\u4e2a\u6574\u4f53\u800c\u8212\u9002\u7684\u4f11\u61a9\u5ea7\u6905 \u00a0<\/span><\/strong>A<\/span>\u00a028 meter long and 46 cm high dark patina bronze sculpture provides fully integrated and comfortable seating opportunities.<\/span><\/p>\n <\/p>\n <\/p>\n Landscape Architecture: Sch\u00f8nherr <\/p>\n
\n Thanks Sch\u00f8nherr for authorizing the publication of the project on mooool, Text description provided by Sch\u00f8nherr.<\/span><\/span><\/strong><\/p>\n
<\/a>
<\/a>
<\/a>
<\/a>
<\/a>
<\/a>
\n<\/a>
\n<\/a>
\n<\/a><\/p>\n
\nProject group: Landscape architect Torben Sch\u00f8nherr, Professor Architect MAA Carsten Juel-Christiansen and Sculptress Marianne Hesselbjerg
\nEngineer: Hasserisgaard Ingeni\u00f8rkontor and Havnecon Consulting Aps
\nClient: The Danish Arts Foundation and Holmland Municipality
\nDesign period: 2004-2005
\nConstruction: 2006
\nArea: Facing stone area 1.350 m2
\nCosts: 2 mio. DKK<\/p>\n