{"id":366159,"date":"2022-11-03T16:29:24","date_gmt":"2022-11-03T08:29:24","guid":{"rendered":"https:\/\/mooool.com\/duero-lookout-by-hollegha-arquitectos.html"},"modified":"2022-11-03T16:34:41","modified_gmt":"2022-11-03T08:34:41","slug":"duero-lookout-by-hollegha-arquitectos","status":"publish","type":"post","link":"https:\/\/mooool.com\/en\/duero-lookout-by-hollegha-arquitectos.html","title":{"rendered":"Duero Lookout by Hollegha arquitectos"},"content":{"rendered":"

\u672c\u6587\u7531Hollegha arquitectos\u6388\u6743mooool\u53d1\u8868\uff0c\u6b22\u8fce\u8f6c\u53d1\uff0c\u7981\u6b62\u4ee5mooool\u7f16\u8f91\u7248\u672c\u8f6c\u8f7d\u3002<\/span><\/span><\/strong>
\n Thanks Hollegha arquitectos for authorizing the publication of the project on mooool, Text description provided by Hollegha arquitectoss.<\/span><\/span><\/strong><\/p>\n

 <\/p>\n

Hollegha arquitectos<\/strong><\/a>\uff1a\u8be5\u9879\u76ee\u7684\u6700\u5927\u6311\u6218\u662f\u60ac\u6311\u5e73\u53f0\u7684\u9759\u6001\u89e3\u51b3\u65b9\u6848\u3002\u65e7\u7684\u5236\u9ad8\u70b9\u662f\u5728\u4e00\u4e2a\u4e25\u91cd\u51f9\u9677\u7684\u5ca9\u4f53\u4e0a\uff0c\u5b83\u4f4d\u4e8e\u4e00\u4e2a\u503e\u659c\u7684\u5e73\u9762\u4e0a\u3002\u51fa\u4e8e\u6b64\u539f\u56e0\uff0c\u65b0\u7684\u5236\u9ad8\u70b9\u7684\u9759\u6001\u65b9\u6848\u662f\u57fa\u4e8e\u4e00\u4e2a\u5361\u5728\u5ca9\u4f53\u4e2d\u4f5c\u4e3a\u914d\u91cd\u7684\u57fa\u7840\u677f\u3002\u56e0\u6b64\uff0c\u4e0d\u592a\u7a33\u5b9a\u7684\u5ca9\u77f3\u533a\u57df\u4e0d\u4f1a\u53d7\u5230\u538b\u529b\u3002<\/p>\n

Hollegha arquitectos<\/strong><\/a>: The biggest challenge of the project was the static solution for the cantilever platform. The old vantage point was on a heavily indented mass of rock that rests on an inclined plane. For this reason, the static approach of the new vantage point is based on a foundation plate that is stuck in the rock massif as a counterweight. As a result, the less stable rock area is not stressed.<\/p>\n

 <\/p>\n

\u25bd\u9879\u76ee\u89c6\u9891 Video<\/span><\/p>\n