本文由 James and Mau Arquitectura 授权mooool发表,欢迎转发,禁止以mooool编辑版本转载。
Thanks James and Mau Arquitectura for authorizing the publication of the project on mooool, Text description provided by James and Mau Arquitectura.

 

James and Mau Arquitectura:项目可用场地是一片大型平坦工业地块上的绿地,周围环绕着工业建筑、员工停车场、卡车场和刻进入场地的小型办公楼。

James and Mau Arquitectura: The available land is a green area on a large flat industrial plot surrounded by an industrial building, a parking lot for employees, a truck yard and a small office building that gives access to the enclosure.

 

▽北立面 North Elevation

© Jakub Certowicz
© Jakub Certowicz

 

紧挨着最后一座建筑的是一片小树林,我们决定保留它并将其用作新建筑的前厅,最重要的是让其成为项目的核心。在这样一个严苛的环境中,我们希望该项目能够成为一个净化环境的庇护处,而不仅仅是办公楼。

Precisely next to this last one there is a small forest of trees which we decided to maintain and use as a physical antechamber of the new building but above all as a psychological generator of the project. In such a hostile environment we wanted office work to be a purifying refuge from the environment beyond the mere office building.

 

© Jakub Certowicz
© Jakub Certowicz
© Jakub Certowicz
© Jakub Certowicz

 

新建筑将现有的绿地分成三个部分,北部、南部和东部的建筑立面都在向这三个部分延伸,特别是建筑的边界通过厚墙延伸。这些建筑创造了外部围护结构,作为办公室和工业工作之间的缓冲区,产生了一种建筑之外的一切都是绿色的感觉,使忘记了我们周围的环境。后者通过使用非典型的工业立面材料(如砖)而得到加强 。

The new building splits the existing green area into three parts, to which the northern, southern and eastern façades are looking to, but especially towards which the boundaries of the building are extended by thick walls. These create exterior enclosures that act as a buffer between office and industrial work, generating the feeling that beyond the building everything is green, forgetting the environment around us. The latter is enhanced by the use of a non typical industrial facade material such as brick.

 

▽东立面 East Elevation

© Jakub Certowicz
© Jakub Certowicz
© Jakub Certowicz
© Jakub Certowicz

 

西立面毗邻工业区,因此提供服务或占用较少的用途,几乎没有任何空隙。其他三个立面用于房间、办公室和员工公寓,并有大窗户捕捉光线,金属百叶窗控制阳光入射,避免在夏天避免阳光照射,在冬天捕捉阳光 。

The western façade is adjacent to the industrial zone and therefore houses the services or less occupied uses closing it with hardly any gaps. The other three façades house uses of rooms, offices and staff apartments and have large windows to capture light and metal louvers that control the solar incidence avoiding it in summer and capturing it in winter.

 

▽西立面 West Elevation

© Jakub Certowicz
© Jakub Certowicz
© Jakub Certowicz

 

该项目的一小部分分布在二楼,以减少占用现有的绿地面积。通过这种方式,大量的办公室出现了,由于整个外围面积的缩小,这些办公室从不利的环境中抽象出来。

A smaller part of the programme is distributed on the second floor to occupy less of the existing green area. In this way, a volume of offices emerges, abstracted from the hostile environment thanks to the retreat of the entire perimeter.

 

▽二楼的办公空间在环境中突显出来 The office space on the second floor is highlighted in the environment

© Jakub Certowicz
© Jakub Certowicz
© Jakub Certowicz
© Jakub Certowicz

 

在一楼有两个双层玻璃幕墙的“热缓冲”空间,由于百叶窗是太阳能控制,它们在冬天可以加热,在夏天冷却。正是通过它们,清洁的室外空气在进入室内之前被预处理,以减少能耗。它是热回收机的被动替代品,用于通风,或同样的“热缓冲”空间成为这样的机器,也可以作为用户休息、吃饭、聊天等的温室或露台使用和享受。

On the ground floor there are two “thermal buffer” spaces with double glazed facades which thanks to solar control of the louvers are heated in winter and cooled in summer. It is through them that the clean outdoor air is preclimatized before entering the interior for less energy consumption. It is a passive alternative to heat recovery machines for ventilation, or what is the same “thermal buffer” spaces become such machines which can also be used and enjoyed by users as greenhouses or terraces in which to rest, eat, chat, etc..

 

© Jakub Certowicz
© Jakub Certowicz
© Jakub Certowicz
© Jakub Certowicz
© Jakub Certowicz

 

▽场地平面图 Site Plan

© James and Mau Arquitectura

 

▽楼层平面图 Groundfloor & First floor

 

▽立面图 Elevation

▽剖面图 Section

 

 

 

项目名称:The Office
项目地点:波兰 涅波维奇
竣工年份:2022年
建筑面积(m²):660
公司名称:James和Mau Arquitectura
网站:https://jamesandmau.com/
联系人电子邮件:info@jamesandmau.com
社交媒体:INSTAGRAM-https://www.instagram.com/jamesandmau/
FACEBOOK–FACEBOOK.com/jamesandguarch
图片来源:Jakub Certowicz

Project name: The Office
Project location: Niepołomice, Poland
Completion Year: 2022
Building area (m²): 660
Company name: James and Mau Arquitectura
Website: https://jamesandmau.com/
Contact e-mail: info@jamesandmau.com
Social Media: INSTAGRAM – https://www.instagram.com/jamesandmau/
FACEBOOK – facebook.com/jamesandmauarch
Photo credits: Jakub Certowicz

 


保留的小树林成为严苛环境中的一片净土。

审稿编辑:SIM

更多 Read more about:James and Mau Arquitectura


0 Comments